Campus-Wide Steam-to-Hot-Water ConversionÂ
JGN converted 9 fully occupied buildings from an aging district steam system to a high-efficiency low-temperature hot water hydronic system.The work included installing 21 boilers and 6 combined heat and power (CHP) engines, along with extensive modifications to existing air handling units, heat exchangers, and piping.
​
In partnership with World Energy Solutions,
JGN installed more than 30,000 feet of piping and new infrastructure across the MSK Supercampus, the Zuckerman Research Center, and the Rockefeller Research Laboratories. Campus wide upgrade to direct current (DC) powered LED lighting is also being implemented in ongoing efforts
​
The upgrade saves MSK $7.9 million per year in energy costs
Project Highlights
The reason our clients use JGN time and time again
MSKCC Cyclotron Facility
JGN built the cyclotron vault and supporting spaces that allow Memorial Sloan Kettering to produce radiopharmaceuticals in-house. At the time of construction, it was the largest cyclotron suite worldwide.
​
JGN's value engineering saved MSK more than $10 million by redesigning the pneumatic tube system to minimize shielding requirements.
​
A custom rigging strategy lowered the cyclotron through an adjacent areaway into the Schwartz Building cellar. This avoided a costly excavation of the front facade and saved significant time on the schedule.
Metrovest Offices
MSKCC Haupt 3rd Floor
Urgent Care Center
An architecturally stunning space, fully custom, sleek and cohesive.Â
​
No detail was overlooked on this gut renovations of this executive high-rise suite. Frameless glass partitions and book-matched veneer paneling demanded exceptionally tight field tolerances
​
Extensive coordination across multiple trades brought the seamless design intent to life. The result is a space built to impress, and worthy of its sweeping skyline views.
With over 40Â years experience we have been entrusted with some of the most logistically difficult projects in the most sensitive environments.
Gut renovation of the 3rd Fl of the Haupt Building. The Urgent Care Center included 25 Patient rooms and ancillary support spaces.Â
​
Over $70k was saved in steel notches alone through tedious MEP coordination with a slab-to-slab height of only 10'4"Â
​
All rooms were equipped with E-glass break away doors and Modular Headwalls to future proof the space.